Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from Shondra on Jan 9 at 9:48 AM Thanks so much Carl!! That was the issue. It works perfectly.
| | | ---------------Original Message--------------- From: Shondra Sent: Wednesday, January 08, 2014 4:23 PM Subject: CO19-Time Event Error Message Hello gurus, I really need your help. Each time I try to perform a partial confirmation in CO19 I receive the following error message: Error in actual time determination Message no. RU440 System Response With breakpoint-, partially completed and final confirmations the actual time is calculated for the confirmation interval thereby completed. Here an error has occurred. Procedure You should check whether one of the following points could have triggered the error: No shift sequence was assigned to the work center. No available capacity was defined for capacity entered in the work center for scheduling. The factory calendar has not been maintained for the current calendar year. The reporting time lies before 01.01.1970. The work center entered does not exist. I can start processing, but I can not do a partial confirmation. Please help! Thanks in advance, Shondra | | Reply to this email to post your response. __.____._ | In the Spotlight Become a blogger at Toolbox.com and share your expertise with the community. Start today. _.____.__ |