| | Posted by Anand Sharma (Senior Consultant SAP MM) on Aug 20 at 12:02 PM | |
Jose,
As i understand we cant pick value for the STO then may be you look at the
range of quantity i am not sure you can do that or not...just an idea.
regards
On Thu, Aug 20, 2009 at 11:39 PM, Jose_Oyon via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
> Posted by Jose_Oyon(SAP Consultant)
> on Aug 20 at 11:43 AM We would like to have a release strategy for the
> stock transport orders
> to work the same way as for standard Pos i.e., different strategies to
> be applied for different ranges of the total transfer value of the
> materials covered in the STO.
>
> As you are all aware, for applying PO Release Strategy for standard
> purchase
> orders, we make use of a characteristic which refers to the field GNETW
> (total net order value) in the structure CEKKO to design different
> release strategies for different PO value ranges. However, this method
> does not work for stock transport orders, since the field GNETW always
> has a value of zero.
>
> Since the release strategy works only with the fields in the structure
> CEKKO / CEKKOZZ, how to design a release strategy for this requirement
> based on the total transfer value in the STO?
> Is there a way to update CEKKO-GNETW for stock transport orders (STO)?
> I hope the requirement is clear to you. I will be grateful if you can
> suggest some ideas.
> Thanks and regards, Jose Oyon.
__.____._ As i understand we cant pick value for the STO then may be you look at the
range of quantity i am not sure you can do that or not...just an idea.
regards
On Thu, Aug 20, 2009 at 11:39 PM, Jose_Oyon via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
> Posted by Jose_Oyon(SAP Consultant)
> on Aug 20 at 11:43 AM We would like to have a release strategy for the
> stock transport orders
> to work the same way as for standard Pos i.e., different strategies to
> be applied for different ranges of the total transfer value of the
> materials covered in the STO.
>
> As you are all aware, for applying PO Release Strategy for standard
> purchase
> orders, we make use of a characteristic which refers to the field GNETW
> (total net order value) in the structure CEKKO to design different
> release strategies for different PO value ranges. However, this method
> does not work for stock transport orders, since the field GNETW always
> has a value of zero.
>
> Since the release strategy works only with the fields in the structure
> CEKKO / CEKKOZZ, how to design a release strategy for this requirement
> based on the total transfer value in the STO?
> Is there a way to update CEKKO-GNETW for stock transport orders (STO)?
> I hope the requirement is clear to you. I will be grateful if you can
> suggest some ideas.
> Thanks and regards, Jose Oyon.
Copyright © 2009 CEB Toolbox, Inc. and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
White Papers
In the Spotlight
Share Knowledge About SAP Scripting. Join the New Discussion Group
View this thread online
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion