Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Hi, Unfortunately, it is not the way how SAP has been designed as the reset of release strategy will not take place in the hierarchical manner as per your request. Cheers, HT
| | | ---------------Original Message--------------- From: Daniele Campagnuolo Sent: Friday, November 25, 2011 12:22 PM Subject: Reset Flow for Purchase Requisition Hi all, I need to know how customize flow for reset of release strategy for purchase requisition. I have set the release strategy with this procedure. Release code A, B, C. I can release B if i have already released A. I can release C if i have already released A and B. Now, in ME54, I can reset the strategy with code A, if the purchase requisition has a C status. This is a problem, because i need to set the reset flow with this steps: To Reset B, before I must reset C status and then I can reset B To Reset A, before I must reset C status, then reset B and then A. I hope you can help me Bye | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | ha_tran SAP Logistics Material Management Top Contributor
Contributed the most posts in a group for 3 consecutive months to earn a Gold Achievement Popular White Papers In the Spotlight _.____.__ |