Question from wagoss56 on Jul 14 at 1:58 PM I have a requirement from my client that wants to have the work order due the first of every month (Key Date, 0% Shift Factor).However, they also want to have the Basic Finish date to fall on the last day of the month for which the Plan is called., e.g. Basic Start = 01-Jun-2017, Basic Finish = 30-Jun-2017. Basic Start = 01-Feb-2017, Basic Finish = 28-Feb-2017. I can achieve getting the Start Date and End Date to be on the first of the month (Key Date, 0% SF, and Scheduling Parameters to not automatically adjust dates (option 3: Do not adjust Basic dates to order start) and Automatic Scheduling is turned off. Is there standard configuration to have the dates of a Prev. Maint. work order be defined as the first and last day of the month, e.g. Start Date + (# days in month - 1). If not, has anyone defined any development to make this happen? Note: They are wanting these dates because their is a compliance report that calculates the actual compliance date by looking at these dates and then looking at "Grace Period" table. The grace period is different for each frequency. Thanks | Reply to this email to post your response. __.____._ | _.____.__ |