Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from GeertPeeters on Jun 11 at 6:01 PM I don't think you will manage using the available put away strategies. You could look at the near picking bin strategy where you put away to a fixed bin first and when this is full, the operator will be directed to a bin in the close proximity of the fixed bin. This strategy assumes that both fixed bin and near bin are in one physical area, whereas I feel your goal is to put away in 2 physical areas. Only option left then is to activate the user exit and to develop your own logic. Best regards, Geert
| | | ---------------Original Message--------------- From: griffo56 Sent: Thursday, June 08, 2017 9:04 AM Subject: Putaway Strategy For Pickface Storage Type I have two storage types Pickface (which is non mixed storage but not fixed bin) and Bulk During Putaway I want SAP to fill ONE bin ONLY in the Pickface storage type, but then Putaway the rest of the Putaway Qty to the Bulk storage type. As it stands in the Storage type search, for Stock Removal; If I set the storage type Pickface first, followed by Bulk, the system would in theory take up all the bins in the pickface before it would start to Put them away to bulk. Only when the pickface would have no more bins left would it then move the rest to bulk. This is not what I want. | | Reply to this email to post your response. __.____._ | _.____.__ |