Hi Duri, thanks for your help. The company where I?m working has one Plant for each Society, and each Plant have several storage locations for each physical branch of it. And I?m working with just one branch (storage location) where I need to run the MRP, so I have no possibility to separate the stocks of faulty material in different storage locations. Do you think of any other possible solution?
| | | ---------------Original Message--------------- From: Duri Gopalakrishna Sent: Friday, May 20, 2011 11:30 AM Subject: Split Valuation with MRP Hi You can store faulty material in a separate storage location and eliminate that storage location from MRP by making it non MRP relevant All the best Gopalakrishna Duri | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Popular White Papers In the Spotlight _.____.__ |