We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

Re: [sap-log-pm] KKS code Power Generation

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by fernandofutata
on 06/19/2009 02:03:00 AM

Answering your question regarding KKS structure in power plants. My
plant has the same structure in SAP. Usually we use the first 2
characters to indicate the first father (i.e. C0). The other will be
subsystem 1 with 5 characters (C0GKU). Then, if the quantity of
equipments in your plant is extensively high, prefer using subsystem 2
with 7 characters as (C0GKU10). Then the final element will be the
equipment (C0GKU10AA001). So the structure of fathers and sons will be
like below:
C0
C0GKU
C0GKU10 (only applicable in case there are a lot of equipments,
otherwise go straight to the final equipment)
C0GKU10AA001
Best Regards,
Fernando
2009/6/19 nandipatin via sap-log-pm <sap-log-pm@groups.ittoolbox.com>:
>
>
> Hi,
> The structuring does not contain any hirarchy, I don't know how the user
> going to trace the required func. loc during any operational performance! I
> think you should give a proper thought.
__.____._

Copyright © 2009 CEB Toolbox, Inc. and message author.

Toolbox.com
4343 N. Scottsdale Road
Suite 280
Scottsdale, AZ 85251

0 comments:

Post a Comment

T r a n s l a t e to your language