We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-log-mm] How to Change Valuation Type from HLBL to HLBT on a Transacted Item?

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Question from cnrsimha on Nov 28 at 2:33 PM
Hi

We used to purchase a cable assembly as a bought out item The material master was configured as a bought out item. After few months our purchase has decided to but it as a sub contract part by using available stock of raw material. With out changing the material master to reflect that cable asssembly asa sub contract part, they have a released a sub contract purchase order and now after the material has arrived the system is giving error in creating GRN. I tried to modify material master to configure this assembly as a sub contract part (MRP2 screen). The system gave error as the cable assembly was available in shop floor stocks. I removed the stock through 201 movement and again tried to change the material master. The system is again giving error that the stocks are available in the same storage locations though I had removed the same (MMBE transaction clearly shows no stock)
 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
Copyright © 2014 Ziff Davis, LLC. and message author.
Ziff Davis, LLC. 28 E 28th Street New York, NY 10016
cnrsimha  
 
View this online
Ask a new question
 
In the Spotlight
Become a blogger at Toolbox.com and share your expertise with the community. Start today.

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language