Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Hi all, I need to know how customize flow for reset of release strategy for purchase requisition. I have set the release strategy with this procedure. Release code A, B, C. I can release B if i have already released A. I can release C if i have already released A and B. Now, in ME54, I can reset the strategy with code A, if the purchase requisition has a C status. This is a problem, because i need to set the reset flow with this steps: To Reset B, before I must reset C status and then I can reset B To Reset A, before I must reset C status, then reset B and then A. I hope you can help me Bye | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Popular White Papers In the Spotlight _.____.__ |