We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

RE:[sap-basis] DB13 Actions failing : Scheduling failed

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by shivangini_g(system engineer)
on 06/25/2009 12:50:00 AM

Hi
I tried the rescheduling of jobs and they are working in most systems now but one system isn't letting me do anything, even rescheduling jobs gives me an error.
"Function DB6_PLAN_DELETE_BATCH failed with return code = Job error"
The OS is HP-UX B.11
OP release : B.11.23
DB version is 700.00
DBSL patch level 167
Another peculiar problem with this system is the backups taken of the system are not visible on the SAP level but they are clearly getting completed succesfully as seen with the OS level backup logs.
Thankyou for all the help you've given me so far.
Shivangini
__.____._

Copyright © 2009 CEB Toolbox, Inc. and message author.

Toolbox.com
4343 N. Scottsdale Road
Suite 280
Scottsdale, AZ 85251
Related Content
White Papers

In the Spotlight
Get Total Access to the Most Relevant White Paper Research. Visit the White Paper Library at Toolbox for IT.
_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language