Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Hi hassan I think before updating spam/saint just check your patch update. Regards, SAMI On Sat, Sep 4, 2010 at 9:32 PM, D. Caddick via sap-basis < sap-basis@groups.ittoolbox.com> wrote: > > Posted by D. Caddick (SAP > NetWeaver/BASIS Consultant) > on Sep 4 at 5:32 PM Hi > Hassan, > > Did you check Tx SMLT maybe the Spanish Language was not imported > successfully. If this does not solve the problem you need to open a message > with SAP. > > Regards > > From: hassan83 via sap-basis [mailto:sap-basis@Groups.ITtoolbox.com]<http://groups.ittoolbox.com%5d/> > Sent: 04 September 2010 20:50 > To: D. Caddick > Subject: [sap-basis] update SPAM/SAINT stuck in prologue phase > > Posted by hassan83 (SAP admin) > on Sep 4 at 3:50 PM > > > Hello, > > I am trying to update SPAM/SAINT 640 from 17 to 36 and after loading the > package and pressing on "Import SPAM?SAINT update" I get the error that " > the queue SAPKLE640SR1NW04FF0 has not been yet confirmed" and the status is > stuck on phase Prologue. > I have checked the package SAPKLE640SR1NW04FF0 and it seems for Spanish > language.My system ID is TST. and when I am pressing on Confirm i have a > message that the OSC package queue is empty. | __.____._ Copyright © 2010 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | _.____.__ |