Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Apparently the system is looking for a standard cost for the material. Check the material for the plant that issued the material (MM03) and see what is the price control (V -moving average or S- standard price and if there is any standard price assigned to the material (Accounting Data 1 tab). If it is Zero you may need to maintain the same. While the revenue from the item may be Zero the system may be still trying to calculate the cost of goods sold for COPA.
| | | ---------------Original Message--------------- From: Johngso Sent: Tuesday, March 22, 2011 5:28 PM Subject: Release Billing Documents to Accounting I have four billing documents on the VFX3 list that are giving me an error when I try to release them to Accounting. The error is as follows: In Profitability Analysis, the system tried to valuate a line item using the current standard cost estimate. In order to determine the current plan period, the system needs to read the valuation segment of the material master The system has found that the current plan period is not filled for the product in plant. Has anyone seen this error before? If so, please advise how you handled it. Also, these billing documents are for R&D items that are no charge to the customer. Thanks, John | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Most Popular White Papers In the Spotlight _.____.__ |