We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-acct] Make to order scenario with cost component split in COAP

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by mcompri
on Aug 11 at 2:57 PM
In our environment we use make to order scenario with requirement class that has Account Assignment M and Valuation M. The same requirement class has assembly type 2. This allow us to use for the sales order item the cost estimate generated in the production order that is created when the sales order item is saved. The production order cost is not based on a BOM structure and won't ever be since no material BOM will be created. The PP user will enter the components and the routing in the production order and this will be costed based on what the production order contains.
This production cost estimate is then saved on the sales order item under condition type EK02 and transferred to copa at the time of billing. The problem we are facing is that NO cost component split is sent to COPA at the time of billing. We do have a cost component split on the production order, though. Is there a way I can use this CCS for my postings to PA?
Thank you
M.

__.____._
Copyright © 2010 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
In the Spotlight
How Do You Use Social Media to Advance Your Career? Take the Survey, Win an iPad
_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language