| | Posted by hovering_yogi (SAP SD Consultant, Sony) on Mar 10 at 9:47 AM | |
Search on this - I really get a bit tired of the number of times this
question is asked - and as a fi-co consultant you should anyway know lots
about current periods and how to keep them up to date (even if mmpv is
vaguely mm/sd related more than fi)
Why do people continue to post questions without first having to try and
help themselves....
On 10 March 2010 14:15, naveenkumar5 via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
> Posted by naveenkumar5(fico consultant)
> on Mar 10 at 9:18 AM
> posting only possible in periods 2010/12 and 2010/11 in company code NAV
> Message no. M7053
>
> Diagnosis
> The posting date entered is not within one of the permitted posting periods
> (current period/previous period).
>
> This can be due to one of two reasons:
>
> The correct current period has not been set in the system.
> For the system, the first of the entered periods is the current period. At
> the beginning of a new period, your systems administrator must change the
> current period in the material master record, using the function "Shift
> periods". This has not yet been done.
> You have entered a wrong date in the field "Posting date".
> Procedure
> Check the posting date and correct it if necessary. If your input is
> correct, inform your systems administrator that the "period shifting"
> (period-end closing) process has not yet been completed. Copied from M8022
__.____._ question is asked - and as a fi-co consultant you should anyway know lots
about current periods and how to keep them up to date (even if mmpv is
vaguely mm/sd related more than fi)
Why do people continue to post questions without first having to try and
help themselves....
On 10 March 2010 14:15, naveenkumar5 via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
> Posted by naveenkumar5(fico consultant)
> on Mar 10 at 9:18 AM
> posting only possible in periods 2010/12 and 2010/11 in company code NAV
> Message no. M7053
>
> Diagnosis
> The posting date entered is not within one of the permitted posting periods
> (current period/previous period).
>
> This can be due to one of two reasons:
>
> The correct current period has not been set in the system.
> For the system, the first of the entered periods is the current period. At
> the beginning of a new period, your systems administrator must change the
> current period in the material master record, using the function "Shift
> periods". This has not yet been done.
> You have entered a wrong date in the field "Posting date".
> Procedure
> Check the posting date and correct it if necessary. If your input is
> correct, inform your systems administrator that the "period shifting"
> (period-end closing) process has not yet been completed. Copied from M8022
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
In the Spotlight
Earn Recognition for Your Contributions at Toolbox for IT. Gain Points for Community Achievements
View this thread online
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion