[sap-acct] Translation Date in Recurring Entry
Posted by
Admin at
Share this post:
|
0 Comments
Posted by jp1507 (SAP End user support) on Feb 28 at 12:12 PM |
Hello,
When I create a recurring entry (FBD1) I need the Translation Date to be different from Posting Date( 28.04.2009) and Document Date, so I entered a Translation Date( 01.04.2009). The Recurring entry document was created fine, with the dates set as I needed them. When the accounting document was created , it was created with Translation Date (28.04.2009) same as posting date.
Can someone please explain me why this happens.
Thank you
__.____._ When I create a recurring entry (FBD1) I need the Translation Date to be different from Posting Date( 28.04.2009) and Document Date, so I entered a Translation Date( 01.04.2009). The Recurring entry document was created fine, with the dates set as I needed them. When the accounting document was created , it was created with Translation Date (28.04.2009) same as posting date.
Can someone please explain me why this happens.
Thank you
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
In the Spotlight
_.____.__ Earn Recognition for Your Contributions at Toolbox for IT. Gain Points for Community Achievements