[sap-log-mm] Raw Material Inventory Control linked with PO
Posted by
Admin at
|
Share this post:
|
0 Comments
| | Posted by Tehseen Akbar on Aug 1 at 6:35 PM |
Hi All,
Our managment has a new requirement of controlling the raw material inventory and applying minimum and maximum stock levels at plant level. I would like to know that what configurational and master data settings are required to implement such level of control. Basically the control has to be linked with the approval of PO with respect to quantity and value and it should also consider the open purchase orders and goods in transit. Everytime a PO is raised, the system must calculate that the total stock on hand plus goods in transit must not exceed the maimum stock level defined. Does such kind of control has to be linked with MRP as MRP is not yet in place now. Can such kind of control be taken care by MM module only wihtout any user exit.
Regards
Tehseen
_________________________________________________________________
Show them the way! Add maps and directions to your party invites.
http://www.microsoft.com/windows/windowslive/products/events.aspx=
Copyright © 2009 CEB Toolbox, Inc. and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
White Papers
In the Spotlight
How Can Predictive Analytics Drive Competitive Advantage? Find out here
View this thread online
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion