Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from Duri Gopalakrishna on Apr 1 at 1:11 PM Hi use T.code MMSC for the material and plant. Remove the sloc assignment. Gopal
| | | ---------------Original Message--------------- From: Fahad iQTIDAR Sent: Wednesday, April 01, 2015 1:00 PM Subject: How To Prevent Material Reservation On An SLOC Well the only way I can think of is to mark that material for deletion on the storage location level..That will block all movements for the material on the specified storage location though. Appropriate message settings may also be required to be done. If you can explain your requirement in more detail, we may be able to suggest a better solution. | | Reply to this email to post your response. __.____._ | _.____.__ |