Hello, You could separate only if you are using MRP areas. Creating a MRP area for the subcontractor will allow a separated MRP run for their needs The Factory will use the default MRP area Be careful: once MRP areas activated, no turning back. Check existing reporting around MRP to analyze impact of having this extra field http://help.sap.com/saphelp_46c/helpdata/en/c4/106 956ae8a11d1a6720000e83235d4/content.htm
| | | ---------------Original Message--------------- From: mthangaraj Sent: Thursday, September 01, 2011 9:55 PM Subject: Separate PR for Different MRP Element Hello All, Is there chance to cumulate the PR for SUBREQ and ORDRES Separately. We are using same material for subcontracting order as well as in house production, but system is cumulating both and releasing one PR for total requirement..we need separate PR. ORDRES : 100 SUBREQ : 100 Min order Qty is 5000 Need Two PR with 5000 qty, we are getting one PR with 5000 qty. Please advise. Thanks Morgan | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | _.____.__ |