Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Hi, Just to get a clear perspective, do you have the required calculation method in OKGC. That is does there you maintain RA key FERT Status REL - WIP Calculation on the basis of Actual costs DLV - Cancel Data of WIP Calculation and Result Analysis TECO - Cancel Data of WIP Calculation and Result Analysis PREL - WIP Calculation on the basis of Actual costs for your controlling area?? ARI
| | | ---------------Original Message--------------- From: srk_siva Sent: Wednesday, December 08, 2010 12:08 AM Subject: WIP Product cost collector - Production Order Status Hi Experts, We have a requirement to consider Production order status while calculating WIP for the Product cost collector. As per the standard SAP the status of the Production order is not taken into consideration while calculating WIP for product cost collectors. However our business wants to have that the status of the Production order should be considered while calculating WIP for Product cost collector. e.g. If the status of the Production order is REL/PREL WIP should be calculated If the status of the Production order is DLV/TECO then the already posted WIP should be reversed. Can you please advise if there is any configuration or any OSS note that can help to achieve this requirement. Thanks & Regards Siva. | | __.____._ Copyright © 2010 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | ARI SAP Accounting Helper
Posted helpful replies on 5 threads in a group to earn a Bronze Achievement Related Content Most Popular White Papers In the Spotlight _.____.__ |