Re:[sap-log-mm] posting only possible in periods 2010/12 and 2010/11 in company code NAV Message no. M7053
Posted by
Admin at
Share this post:
|
0 Comments
Posted by amit_ahiniya (sap pp consultent) on Mar 10 at 10:07 AM | Mark as helpful |
ur perid is closed check ur period in mmrv or mmpv
On Wed, Mar 10, 2010 at 7:45 PM, naveenkumar5 via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
> Posted by naveenkumar5(fico consultant)
> on Mar 10 at 9:18 AM
> posting only possible in periods 2010/12 and 2010/11 in company code NAV
> Message no. M7053
>
> Diagnosis
> The posting date entered is not within one of the permitted posting periods
> (current period/previous period).
>
> This can be due to one of two reasons:
>
> The correct current period has not been set in the system.
> For the system, the first of the entered periods is the current period. At
> the beginning of a new period, your systems administrator must change the
> current period in the material master record, using the function "Shift
> periods". This has not yet been done.
> You have entered a wrong date in the field "Posting date".
> Procedure
> Check the posting date and correct it if necessary. If your input is
> correct, inform your systems administrator that the "period shifting"
> (period-end closing) process has not yet been completed. Copied from M8022
__.____._ On Wed, Mar 10, 2010 at 7:45 PM, naveenkumar5 via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
> Posted by naveenkumar5(fico consultant)
> on Mar 10 at 9:18 AM
> posting only possible in periods 2010/12 and 2010/11 in company code NAV
> Message no. M7053
>
> Diagnosis
> The posting date entered is not within one of the permitted posting periods
> (current period/previous period).
>
> This can be due to one of two reasons:
>
> The correct current period has not been set in the system.
> For the system, the first of the entered periods is the current period. At
> the beginning of a new period, your systems administrator must change the
> current period in the material master record, using the function "Shift
> periods". This has not yet been done.
> You have entered a wrong date in the field "Posting date".
> Procedure
> Check the posting date and correct it if necessary. If your input is
> correct, inform your systems administrator that the "period shifting"
> (period-end closing) process has not yet been completed. Copied from M8022
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
In the Spotlight
_.____.__ 55% of IT Pros Use Social Media to Advance Their Careers. See the Survey Results