Reply from Buss_Potter on Nov 23 at 11:01 AM Cyndi, Best way is to set up a factory calendar with every day as a working day. Then when you schedule a job, click on the blank button at the end of the row of buttons (Immediate, Date/Time, After job etc). Then use the factory calendar, and put 2 into the workday and set the time you want it to run that day. Then click the radio button next to "Workday relative to end of month" and put the period as 1 month (i.e. every month). Hope that makes sense. With Best Wishes Adrian ADRIAN CLARKE Technical Architect Xchanging, a CSC Company The Walbrook Building, 25 Walbrook, London, EC4N 8AQ, UK t: +44 (0)20.3604.3738 | m: +44 (0)7506.797980 | email@removed | www.csc.com/xchanging Twitter | Facebook | LinkedIn | YouTube
| | | ---------------Original Message--------------- From: Cyndi Sent: Tuesday, November 22, 2016 5:21 PM Subject: can a job be scheduled to run the 2nd to the last day of each month. I need to run a job to run the 2nd to the last day of each month - January 30, February 27 or the 28th if it is leap year, etc. | | Reply to this email to post your response. __.____._ | _.____.__ |