Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from allaf-rudwan on May 12 at 4:41 AM Another request also I forget to mention in my main post each branch has different business type. For example branch its building is Free Standing Type FS branch its building is inside Mall ML branch its building is shared with others SH so, should I include these letters within the cost center code or is there any fueld in cost center can maintain cost center type? Thanks
| | | ---------------Original Message--------------- From: allaf-rudwan Sent: Thursday, May 12, 2016 3:25 AM Subject: SAP Cost Center Coding Hi, In reference to this question here http://sap.ittoolbox.com/groups/technical-functional/sap-acct/sap-cost-center-hierarchy-5897936#M5898639 I have another question. The required digits for cost_centers is 4 (currently the company having 300 branches but to be in safe side, I think better to use 4 digits if in the future enlarge) now, each branch is located in different region each region having sub region also the requirement here is to have P/L per branch / per region / per sub region So, if I create parent codes for regional areas then child code (parent) for sub region then the branches will be assigned to sub_region node Here, is it necessary to add to each number for each cost center, region code & sub region code? For example branch number 5 will be under sub_region 03 which under region 02 Here, I can code the cost center for branch number 5 as the following 02030005 each 1st 2 digits on the left "02" refer to main region 02 each 2nd 2 digits on the left "03" refer to sub region 03 each 4 digits from the right side "0005" to refer to branch number But here, I worry about timing issue of transactions, user will always have to type 8 digits or, it is not necessary to add regional & sub regional code, just branch code "0005" as it is already mentioned under its sub region node? | | Reply to this email to post your response. __.____._ | _.____.__ |