We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-log-pm] Changing Purchase Requisitions created from PM Orders

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by sats35 (Mr)
on Aug 8 at 9:20 AM
We create maintenance order (iw31) and in components tab, we give material codes that needs to be procured with item category as 'N' (non-stock) so that PR gets generated. The issue currently we have is, PR created this way is not editable except for some free text fields, even though we open the PR with ME52n.For ex: Valuation Price in Valuation tab(esp if we know, that current market price is either considerably high or low from the one defaulted from material master), delivery_date (we found a work around the change basic start date in maintenance order to delivery date). Is there some setting we should do in SPRO to see that PR opens up for editing (just the way a PR created through ME51n).
This is a burning problem as Purchase are not willing to enter considerable higher or lower price (than that in PR) while maintaining RFQ(ME47).
-Thanks in advance
Satish
__.____._
Copyright © 2009 CEB Toolbox, Inc. and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251

0 comments:

Post a Comment

T r a n s l a t e to your language