[sap-acct] Releasing a WBS element in a currency other than controlling area currency
Posted by
Admin at
|
Share this post:
|
0 Comments
| | Posted by peter_rizzoli (Peter) on Aug 20 at 6:30 PM |
AuC requires an area in the controlling area currency AUD
Message no. AY310
Diagnosis
The controlling area currency AUD is not managed in any of the areas of the asset under construction that is to be created. However, this currency is required for the capital investment measure.
System Response
Error message: Creating the AuC or releasing the order/ WBS element is not possible; or changing the asset under construction is not possible.
Procedure
Check if you manage the controlling area currency in one of the depreciation areas in Asset Accounting, especially in asset class 4001. If you do not, then define such a depreciation area. Make sure that this depreciation is active in asset class 4001.
You can save the order / WBS element if you remove the investment profile that was entered.
If you are in the 'Change asset' transaction, check if you have deactivated a depreciation area that manages controlling area currency AUD. Re-activate this depreciation area.
I am trying to release a project WBS element so I can post. The Project is an Investment Measure ans appears to be a problem. Can you help me solve this?
__.____._ Message no. AY310
Diagnosis
The controlling area currency AUD is not managed in any of the areas of the asset under construction that is to be created. However, this currency is required for the capital investment measure.
System Response
Error message: Creating the AuC or releasing the order/ WBS element is not possible; or changing the asset under construction is not possible.
Procedure
Check if you manage the controlling area currency in one of the depreciation areas in Asset Accounting, especially in asset class 4001. If you do not, then define such a depreciation area. Make sure that this depreciation is active in asset class 4001.
You can save the order / WBS element if you remove the investment profile that was entered.
If you are in the 'Change asset' transaction, check if you have deactivated a depreciation area that manages controlling area currency AUD. Re-activate this depreciation area.
I am trying to release a project WBS element so I can post. The Project is an Investment Measure ans appears to be a problem. Can you help me solve this?
Copyright © 2009 CEB Toolbox, Inc. and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
White Papers
In the Spotlight
How Can Predictive Analytics Drive Competitive Advantage? Find out here
View this thread online
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion