RE:[sap-log-pm] sap PM - use of construction type in fuctional location & Equipment master
Posted by
Admin at
|
Share this post:
|
0 Comments
| | Posted by USER_1660454 on Aug 12 at 10:59 AM | |
Hello Govind, would you please tell me
How to create cost center at work center in Plant maintenance. I am not looking profit center. When I created IR01. In Costing tab its asking me in controlling area & cost center. I create controlling area but its difficult to create Cost center. Can you tell me in detail form controlling area to all the way to costing. Please describe in detail. Thanks for your help. Jamal...Chicago
--- On Wed, 8/12/09, Govind via sap-log-pm <sap-log-pm@Groups.ITtoolbox.com> wrote:
From: Govind via sap-log-pm <sap-log-pm@Groups.ITtoolbox.com>
Subject: RE:[sap-log-pm] sap PM - use of construction type in fuctional location & Equipment master
To: "USER_1660454" <Whiteeagle0073@yahoo.com>
Date: Wednesday, August 12, 2009, 2:37 PM
Posted by Govind (PM MM Consultant)
on Aug 12 at 10:38 AM
Mark as helpful
Hi,
If your client have same model or type of equipments which have same spare parts structure then
1. Create PM assembly ie IBAU material for the equipment
2. Create BOM using above material as Header and assign the spare parts of that equipment as components.
3. Assign the PM assembly code in construction type all the equipments which are same type or same model.
In that way you can use same BOM for more than one equipments no need to create BOM for individual equipments. It will be useful during maintenance order that you can check what are the spare parts are forming the structure and you can use to purchase the spare parts for that equipment maintenance no need to search from the material selection.
Govind
+86 13969873562
__.____._ How to create cost center at work center in Plant maintenance. I am not looking profit center. When I created IR01. In Costing tab its asking me in controlling area & cost center. I create controlling area but its difficult to create Cost center. Can you tell me in detail form controlling area to all the way to costing. Please describe in detail. Thanks for your help. Jamal...Chicago
--- On Wed, 8/12/09, Govind via sap-log-pm <sap-log-pm@Groups.ITtoolbox.com> wrote:
From: Govind via sap-log-pm <sap-log-pm@Groups.ITtoolbox.com>
Subject: RE:[sap-log-pm] sap PM - use of construction type in fuctional location & Equipment master
To: "USER_1660454" <Whiteeagle0073@yahoo.com>
Date: Wednesday, August 12, 2009, 2:37 PM
Posted by Govind (PM MM Consultant)
on Aug 12 at 10:38 AM
Mark as helpful
Hi,
If your client have same model or type of equipments which have same spare parts structure then
1. Create PM assembly ie IBAU material for the equipment
2. Create BOM using above material as Header and assign the spare parts of that equipment as components.
3. Assign the PM assembly code in construction type all the equipments which are same type or same model.
In that way you can use same BOM for more than one equipments no need to create BOM for individual equipments. It will be useful during maintenance order that you can check what are the spare parts are forming the structure and you can use to purchase the spare parts for that equipment maintenance no need to search from the material selection.
Govind
+86 13969873562
Copyright © 2009 CEB Toolbox, Inc. and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
White Papers
In the Spotlight
How Can Predictive Analytics Drive Competitive Advantage? Find out here
View this thread online
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion