Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from Anna on May 8 at 4:34 PM SAP does not recommend changing the base UOM after transactions have been posted. However, it can be done. You should consider the steps and risk of doing the change before you attempt it. In general, you have to delete any stock for the material, close short all open purchasing documents etc. Also once you get all of this backed out, you will still get a hard error. You need to change the status of the msg to a warning instead of an error and revert it after you've changed the material. Be sure to consider all stock (blocked, quality, unrestricted, etc.)..including subcontracted stock at the supplier, if the material is subcontracted. There is an SAP OSS note that explains what you need to do. I don't have the number handy but you should be able to find it via keyword searches. Regards Anna
| | | ---------------Original Message--------------- From: sheikhmz Sent: Tuesday, April 28, 2015 12:13 AM Subject: PR Deletion Why you are to recreate with same number Use the old number or add Letter or some thing to the old number | | Reply to this email to post your response. __.____._ | _.____.__ |