Reply from pairajesh on Mar 6 at 9:54 PM Batch strategy, maintain batch split and check. Thanks.
| | | ---------------Original Message--------------- From: rob_schneider Sent: Thursday, March 06, 2014 9:07 PM Subject: How to Consume Multiple Batches I have set up a material to be back flushed, it is a batch managed part. I then created a my batch strategy in COB2, and it consumes a batch. However if my demand is more than the first batch, then I get a COGI. Is it possible to tell the system to consume the required qty from multiple batches? Example.. Consumption requirement = 50 Inventory = batch1 = 25 batch2 = 10 batch3 = 40 so I would like the system to consume the first two and part of the third batch. | | Reply to this email to post your response. __.____._ | _.____.__ |