Reply from BJE on Mar 6 at 9:46 PM Rob, In your search strategy do you have the number of batch splits set to something other that 0 or 1? It's table-field KONDH-CHASP. If yes what is the error message number in COGI? Regards, BJE
| | | ---------------Original Message--------------- From: rob_schneider Sent: Thursday, March 06, 2014 9:07 PM Subject: How to Consume Multiple Batches I have set up a material to be back flushed, it is a batch managed part. I then created a my batch strategy in COB2, and it consumes a batch. However if my demand is more than the first batch, then I get a COGI. Is it possible to tell the system to consume the required qty from multiple batches? Example.. Consumption requirement = 50 Inventory = batch1 = 25 batch2 = 10 batch3 = 40 so I would like the system to consume the first two and part of the third batch. | | Reply to this email to post your response. __.____._ | _.____.__ |