Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Question from makl59 on Feb 27 at 8:36 AM Who has experience with nZDM/SUM for the installation of EHP7? How can I calculate the replication time and the downtime, so that I can decide the best day for starting the installation in the productive environment? We have ERP 6.0 without any EHP with about 1,6 TB for the Oracle database and about 60-70 GB archives per day. During my installation of EHP7 in the test system nobody was working there - so the time is not representative at all. Here are the times: It took 9 h until SPDD and then 58 h until the backup/start of downtime. The downtime itself was about 10 h. So what should I calculate for the productive system? Thanks for any hint! Maria | Reply to this email to post your response. __.____._ | _.____.__ |