We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-basis] nZDM/SUM for the installation of EHP7

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Question from makl59 on Feb 27 at 8:36 AM
Who has experience with nZDM/SUM for the installation of EHP7?
How can I calculate the replication time and the downtime, so that I can decide the best day for starting the installation in the productive environment?
We have ERP 6.0 without any EHP with about 1,6 TB for the Oracle database and about 60-70 GB archives per day. During my installation of EHP7 in the test system nobody was working there - so the time is not representative at all.
Here are the times:
It took 9 h until SPDD and then 58 h until the backup/start of downtime.
The downtime itself was about 10 h.
So what should I calculate for the productive system?

Thanks for any hint!
Maria
 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
Copyright © 2014 Ziff Davis, Inc. and message author.
Ziff Davis, Inc. 28 E 28th Street New York, NY 10016
makl59  
 
View this online
Ask a new question
 
In the Spotlight
Have a technical question? Need to find IT solutions? Ask your peers in the Toolbox for IT community.

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language