We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

RE:[sap-basis] nZDM/SUM for the installation of EHP7

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Reply from D. Caddick on Feb 27 at 9:47 AM
Hi Maria,

Have you seen SAP Note: 1678565?


Regards

---------------Original Message---------------
From: Maria Klein
Sent: Thursday, February 27, 2014 8:37 AM
Subject: nZDM/SUM for the installation of EHP7

Who has experience with nZDM/SUM for the installation of EHP7?
How can I calculate the replication time and the downtime, so that I can decide the best day for starting the installation in the productive environment?
We have ERP 6.0 without any EHP with about 1,6 TB for the Oracle database and about 60-70 GB archives per day. During my installation of EHP7 in the test system nobody was working there - so the time is not representative at all.
Here are the times:
It took 9 h until SPDD and then 58 h until the backup/start of downtime.
The downtime itself was about 10 h.
So what should I calculate for the productive system?

Thanks for any hint!
Maria

 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
Copyright © 2014 Ziff Davis, Inc. and message author.
Ziff Davis, Inc. 28 E 28th Street New York, NY 10016
D. Caddick  

Consultant
12 achievements
 
Mark as helpful
View this online
Ask a new question
 
In the Spotlight
Earn Recognition for Your Contributions at Toolbox for IT. Gain Points for Community Achievements

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language