We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

Re: [sap-dev] Variant Attributes On Select Options Date

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Reply from AZRS1 on Apr 11 at 1:26 AM
It's been several since I last work with SAP and I don't have access to a system at this time, but

you can do what you want via standard variants;

look/read http://help.sap.com/saphelp_nw70/helpdata/en/c0/98 0374e58611d194cc00a0c94260a5/content.htm

especially the point on Creating Variables for Date Calculations.

Also use se16 and find "tvarv" in data dictionary (field) and "tvarvc" (table).


Procedure


To assign a date calculation variable to an existing variant:

...

1. In the initial screen for maintaining variants, choose the appropriate variant.

2. Select the Attributes field.

3. Choose Change .
The attributes screen for the selected variant is displayed.

4. In the Selection Variable column, press F4 and choose a type of selection variable. The display window shows the possible types for the selected field. ??

5. This graphic is explained in the accompanying text

6. Select type D for dynamic date calculation .

7. In the Variable Name column, choose the F4 help. All possible date calculations are displayed.

8. This graphic is explained in the accompanying text

9. Select an entry and choose Choose.

Note

If necessary, enter the required values. To subtract days, you must enter them in the format of a number with a minus sign in the last position (for example 10-).

Note that you cannot change the proposals in the list, nor can you add new proposals.

Here you can also specify the selection options for the date calculation.

10. Save your entries.
You return to the attributes screen.

11. Save the attributes.

---------------Original Message---------------
From: Raghavender Vadakattu
Sent: Wednesday, April 11, 2012 12:50 AM
Subject: Variant Attributes On Select Options Date

Hi,
I don't think this is possible with exisiting options in variant attribute. Better to build your own logic in PBO i.e. in AT SELECTION-SCREEN OUTPUT event. Hope this is helpful.

Regards,
Raghavender

 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
Copyright © 2012 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
AZRS1  
SR ANALYST
 
Mark as helpful
View this online
Ask a new question
 
In the Spotlight
Earn Recognition for Your Contributions at Toolbox for IT. Gain Points for Community Achievements

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language