Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
I am trying to understand why an MRP requisition generated for a repairable item would not have a unique number, i.e, If the same material number is booked out the MRP requisition increases in quantity and does not generate a new number or add an additional line to the requisition. Is this a normal set up? In theory an MRP requisition could always stay open if the repairable item does not satisfy the min/max level of the repairable fleet. | __.____._ Copyright © 2010 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | _.____.__ |