Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Hi: While its a very valid question, i don't think it would be much of consequence if you have your Test systems DNS isolated to avoid any unintentional linkage/outward processing to PRD until you perform the Basis System refresh Isolation (RFC;s e.t.c)? You would be covered until the system copy completes and then you bring it down, set the wp to 0 and bring it back up. BTCTRNS1 wouldn't be quite useful here as you would delete the PRD scheduled jobs anyway after setting the wp/btc to 0 initially. Regards, Raghav ---------------Original Message--------------- From: asep818 Sent: Tuesday, August 24, 2010 9:29 PM Subject: avoiding background job when importing system > Dear All, > > I run system copy (from SCM prod dual stack) to a test system using > r3lod/jload. In some notes mentioning we need to avoid background job > running in target system, but seems in target sapinst will run the server > automatically with param btc number<>0. there is another way to suspend the > job with btctr..1 report, but how i make sure that i enter the system to run > the report or change parameter btc number to 0 before the background active? > appreaciate your advice. > > Thank you. > > Kind Regards, > -asp- | __.____._ Copyright © 2010 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Raghav SAP Basis Helper
Posted helpful replies on 5 threads in a group to earn a Bronze Achievement _.____.__ |