Posted by viswa-nath on May 1 at 10:06 PM | Mark as helpful |
Hi
If the job got cancelled due to system down, then go to sm37 >find the
cancelled job>copy the job and release it.
Hope this will solve your problem
Thanks
Viswa
On Sat, Mar 27, 2010 at 11:41 PM, D. Caddick via sap-basis <
sap-basis@groups.ittoolbox.com> wrote:
>
> Posted by D. Caddick (SAP
> NetWeaver/BASIS Consultant)
> on Mar 27 at 5:27 PM
> You can only use Program BTCTRNS2 if you ran program BTCTRNS1 before
> shutting down SAP
>
>
>
> From: mridulg via sap-basis [mailto:sap-basis@Groups.ITtoolbox.com]
> Sent: 27 March 2010 14:56
> To: D. Caddick
> Subject: Re: [sap-basis] Reactaviting a scheduled job
>
>
>
>
>
>
>
>
> Posted by mridulg (Analyst)
> on Mar 27 at 12:11 PM
>
> <http://it.toolbox.com/api/ContentVote/3402779/1/1 /> Mark this reply as
> helpfulMark as helpful
>
> Execute BTCTRNS2 through SE38
>
> On Sat, Mar 27, 2010 at 2:35 PM, reji-mathew via sap-basis <
> sap-basis@groups.ittoolbox.com> wrote:
>
> > Posted by reji-mathew(IT Manager)
> > on Mar 27 at 10:48 AM
> > Hi, My server was in down mode during a specific period and in that
> period
>
> > a background job was scheduled which did not execute because of down
> time.
>
> > Now I want to re-activate the all the scheduled job that was failed to
> > execute. How can I re-active please help me.
__.____._ If the job got cancelled due to system down, then go to sm37 >find the
cancelled job>copy the job and release it.
Hope this will solve your problem
Thanks
Viswa
On Sat, Mar 27, 2010 at 11:41 PM, D. Caddick via sap-basis <
sap-basis@groups.ittoolbox.com> wrote:
>
> Posted by D. Caddick (SAP
> NetWeaver/BASIS Consultant)
> on Mar 27 at 5:27 PM
> You can only use Program BTCTRNS2 if you ran program BTCTRNS1 before
> shutting down SAP
>
>
>
> From: mridulg via sap-basis [mailto:sap-basis@Groups.ITtoolbox.com]
> Sent: 27 March 2010 14:56
> To: D. Caddick
> Subject: Re: [sap-basis] Reactaviting a scheduled job
>
>
>
>
>
>
>
>
> Posted by mridulg (Analyst)
> on Mar 27 at 12:11 PM
>
> <http://it.toolbox.com/api/ContentVote/3402779/1/1 /> Mark this reply as
> helpfulMark as helpful
>
> Execute BTCTRNS2 through SE38
>
> On Sat, Mar 27, 2010 at 2:35 PM, reji-mathew via sap-basis <
> sap-basis@groups.ittoolbox.com> wrote:
>
> > Posted by reji-mathew(IT Manager)
> > on Mar 27 at 10:48 AM
> > Hi, My server was in down mode during a specific period and in that
> period
>
> > a background job was scheduled which did not execute because of down
> time.
>
> > Now I want to re-activate the all the scheduled job that was failed to
> > execute. How can I re-active please help me.
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
_.____.__ White Papers
In the Spotlight
Toolbox.com for iPhone: Ask Questions & Get Answers Anywhere. Use the New iPhone App