Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Question from U0304380 on Oct 9 at 1:27 AM Hi, I have a batch of material which is meant to be inspected upon GR but as QM of material master was not set up properly, the status of the inspection lot created was 'CRTD CHCR SPRQ' and the system doesn't allow me to do a GR reversal after correction my QM under MM02. Now my stock is stuck under QI status. Is there any way I can get it out of QI so that the batch can be utilized for COR6? Thanks. | Reply to this email to post your response. __.____._ | _.____.__ |