We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-log-pm] Inserting an Installation Date for Equipment Usage History

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Question from JosephC on Aug 2 at 11:59 AM
So here's the challenge: I have a piece of equipment that was migrated with history so it has multiple usage periods with the current one valid to 12/31/9999. I discover a installation period was missed in the loading of its history. I want to go back and "insert" the usage history by performing a dismantle/install with the valid from date as the beginning of the missed period. Standard SAP gives a hard error.
It seems the logic of an insertion is the same as a new installation. SAP segments the period and performs an update to 2 records in the standard process. In a new dismantle/install, the current record is segmented with the valid to date changing from 12/31/9999 to the new install data and a usage period is created with the new 12/31/9999. For my requirement, a third update would be required where the prior valid to date and the later valid from date would need to be updated. Has anyone solved this issue or found a work around?
 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
© 2016 Ziff Davis, LLC. and message author.
Ziff Davis, LLC. 28 E 28th Street New York, NY 10016
JosephC  
 
View this online
Ask a new question
 
In the Spotlight
Earn Recognition for Your Contributions at Toolbox for IT. Gain Points for Community Achievements

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language