Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from sspromm on May 7 at 1:25 PM Hi I am having issue of wm-pp interface as having two types of material one is semifinished material and Raw material 1) for semifinished materials the consumption is done directly from the semi-finished location, semi-finished will be transferred from its location to shop floor. 2) For the Raw materials with is wm active materials using the handheld device to transfer the materials with WMS active and the T-Code is ZLT06. Quary is how to maintain the configuration and control in the whole process, Thanks in advance,
| | | ---------------Original Message--------------- From: JAE1963 Sent: Thursday, May 07, 2015 10:34 AM Subject: T-Code That Pulls All Open Requirements (POs And Requisitions) For A Specific Vendor I have several vendors that request open order reports. At this time I can pull open POs but not requisitions. I need a report that pulls both by vendor. | | Reply to this email to post your response. __.____._ | _.____.__ |