Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Question from digiovannir on Jan 25 at 7:22 PM Messages were issued when costs were calculated in a network. the Log in cost calculation dispalys error message CK265 Cost transaction 0010: Error converting from HNL -> USD Diagnosis In cost transaction 0010, an error occurred converting the currency from HNL to USD. Procedure Check whether the corresponding exchange rate for exchange rate type P has been entered properly. I checked the Currency exchange rate (transaction OB08). It´s seems to be ok. P 22.01.2015 1USD= 21.20000 1HNL From network header cost itemization and cost component split display amount in HNL Exchange rate type P and costing variant PS01 is set in Planning profile ZTOTAL assigned to project profile Standar costing variant PS02 is assigned to network type PS02 why do I have an error message? I will appreciate your help. Regards, Rafael | Reply to this email to post your response. __.____._ | _.____.__ |