Question from dawrul on Dec 17 at 2:05 PM I'm using variants as non configurable materials which are linked via CS40 with configurable materials so instead of maintaining many Routings and BOMs for many intermediate products A, I use one SuperBOM specified at the configurable material. Where components are transferred from configurable material to non configurable material. But now I'm facing the problem how to setup the super routing - too be more specific how to pick up the planned time for operation from CU60 VC table when the material is not configurable. I have the same operations at the level of my intermediate product A only times are different. 1) Is it possible to use dependencies for routings linked to non configurable materials? 2) How to transfer planned time and operations from configurable material to variant? | Reply to this email to post your response. __.____._ | _.____.__ |