Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Question from cnrsimha on Nov 4 at 4:42 AM I am trying to post a part after inspection. But the system giving the error message "Characteristics of the material cannot be posted". This I understand is due to absence of inspection plan. We created the inspection plan but the same error persisted. However after the changing the date of inspection plan the problem was solved We received one more material and same error repeated. In spite of creating inspection plan for a date prior to GR date, the problem persisted. This is happening for almost all parts where inspection plan is created after GR is made. If I directly go to UD inspected of posting inspection results, the material gets posted. But I think this is not the right process Is there any solution for this issue? | Reply to this email to post your response. __.____._ | _.____.__ |