We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

RE:[sap-log-wm] SUT Check Active

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Reply from tags123 on Oct 29 at 9:27 AM
Hi,

I believe each storage section should have all the bins of same size? In this example, same capacity.

Do I need to use storage bin types in this scenario?

Please let me know.

Thanks

---------------Original Message---------------
From: tags123
Sent: Monday, October 20, 2014 10:32 PM
Subject: SUT Check Active

Hi,

How does 'SUT Check Active' work in SAP WM storage type? Does Storage unit management should be activated 'SUT check active' option to be used? Please let me know.

We do not want to use storage units functionality.

We have a requirement to do putaway based on quantity (number of pieces) in storage bin. Each material should have fixed bin assigned with LE quantity specified. Putaway process should fill the fixed bin up to maximum quantity (LE quantity). Please note there will not be a scenario where transfer order needs to be split. If fixed bin is full, then putaway strategy should assign another empty bin which can only hold certain capacity (capacity ie number of pieces). If fixed bin becomes empty, no other material should occupy this bin except the material assigned to this bin.

What would be the solution? What is the required configuration?

Hope someone can help.

Thanks in advance.

 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
Copyright © 2014 Ziff Davis, LLC. and message author.
Ziff Davis, LLC. 28 E 28th Street New York, NY 10016
tags123  

achievement
 
Mark as helpful
View this online
Ask a new question
 
In the Spotlight
Become a blogger at Toolbox.com and share your expertise with the community. Start today.

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language