Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from Marcospadaro on Jun 16 at 8:28 AM 1) Hy Stefan, thanks for your reply. My aim is to send material data and using the change pointers. 2) I'm trying to send MM to some retailers (Non Sap system) and they need to have all the material master and his material related ( production BOM). To start the relationship i need to send all the materials and after only changing. What will suggest to achieve it even because in the ARTMAS structure i can't see where i can insert those material related. Regards. Marco.
| | | ---------------Original Message--------------- From: Marcospadaro Sent: Monday, June 16, 2014 3:37 AM Subject: Send Artmas With BD10 Hy Folks, I'm quite new with idoc, I'm trying to send an artmas with BD10, and it's working perfectly with material without a BOM, but when I'm trying to send a material with a BOM non of the material of the BOM are in the IDOC, I'm in ECC-6 Retail system, to be more specific: 1) If I try to send the idoc by passing only the material and non the class, the idoc is generated but without the BOM, when I insert the class, the IODC won't even be created. Do I miss something? Do I have to find an user exit to insert de BOM material? Regards. | | Reply to this email to post your response. __.____._ | _.____.__ |