Reply from Massimo65 on Feb 10 at 3:36 AM Hi Kumar, Now I describe you my daily rule Dynamic modification at lot creation, Stage 10 Init, stage, No of Inspect 1 New stage 20 Reject. 1 New stage 10 Stage 20 Skip , No of Inspect 32600, Max Skip dur. 1 New stage 30 Rejec. 1 Nw stage 10 Stage 30 Skip , No of Inspect 32600, Max Skip dur. 1 New stage 10 Rejec. 1 Nw stage 10 Stage 10 has inspection severity 4 This rule doesn't run daily but every two days. Can you suggest me any other parametrization? Best regards, Massimo
| | | ---------------Original Message--------------- From: Fabbrini Massimo Sent: Thursday, February 06, 2014 12:13 PM Subject: How to Create Daily Rule for Inpsection Plan Hi QM consultants, I need your help for solving this problem. I have created inspection plans where dynamics modification is at characteristic level , so every characteristic has a specific modification rule. For some characteristics I need a rule for daily control, only the first inspection lot of the day must start in control, in the others inspection lots of the day must be skip. I have created a rule with Reset period 1 day and two stages, the first is marked as Initial Inspection stage and the second has maximum duration skip 1 day. This rule run, but go KO if i take usage decision. For example, today is 22.01.2014, and reset date is 22.01.2014, if I take an Usage Decision first of creating an inspection lot, reset date change in 23.01.2014 and so the characteristic begin skip for all day long. I ask if is possible not change reset date with usage decision or if is possible create an inspection rule which is daily and run always also with usage decision. I hope it is all clear and wait your help. Best Regards, Massimo Fabbrini | | Reply to this email to post your response. __.____._ | _.____.__ |