Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Question from pamela79 on Dec 30 at 12:13 PM Hi all, 1) Can we have more than one delivery with different routes in one single shipment document? Is it possible to include such deliveries? Any special config required? 2) If above is possible, then how is header route determined in shipment document? 3) In our ECC system, in every route config, we have departure point/destination point mentioned. Clearly it means that the stages in delivery are determined from rout. Is this correct? If this is correct, then that means if we have two routes in two deliveries in one shipment, the stages will be created based on departure/destination point automatically. Am I right? 4) If routes have departure/destination points (that is stages to be created from routes), how will system sequence the stages in shipment document if there are more than one delivery with different routes? 5) Currently we have shipments created manually in ECC. When we create a shipment, we manually add deliveries in shipment document. Then we need to click on planning button and then a pop up comes which asks for forwarding agent, check in dates, etc. Rout is already determined from pop up. If deliveries are not already added to shipment, then on clicking planning button, route is not determined in shipment. I need to know what is the relevance of this planning button? 6) Now we will not manually create shipments. The shipment creation inbound idoc (shpmnt05) in ECC will come from external system. Now we have two challenges. a) As soon as idoc comes into ECC and creates shipment in ECC, we want the shipment document to be in planning status. How is this possible? Since otherwise the route will not be determined in shipment. b) The stages in inbound idoc into ECC are in E1EDK33 segment. Since the route in ECC has departure/destination point, we have asked abapers not to read data from E1EDK33 and it's child segment E1EDT44 001/002 for departure/dest points since single or multiple stages are determined from routes even if there are multiple deliveries with different routes in single shipment. Is this a correct decision? c) If you expect us to read the E1EDK33 and it's child segments as in point B above, then does the idoc need to carry the E1ED44 segments in some sequence provided there are more than one E1EDK33 segments for multiple deliveries so that stages are determined correctly in correct sequence by ECC during shipment creation? Regards, Pamela | Reply to this email to post your response. __.____._ | _.____.__ |