We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-hr] Implementation Strategy for MOLGA 99 change to 24 KSA

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Question from Irfan Malik on Dec 1 at 7:47 AM
Hi Gurus,

I am facing a situation where I have to convert the International (CGrp 99) implementation to (CGrp 24) KSA MOLGA. This is because of the fact that SAP introducated localization for Saudi Payroll.

Current case: My company is running EHP6 which is recently upgraded from EHP4 using technical upgrade. Therefore currently on EHP6 environment my company is running same functionality as EHP4 i.e. everything on 99 MOLGA.

Requirement: Company requires the complete implementation to be converted to 24 MOLGA KSA specific. This also includes that this transition does not impact user experience i.e. no retro restriction, RT availability, use standard processes instead of Z developments like GOSI, EOS, etc.

Possibilities: For the above case I think of following possibilities for which I require your expert opinion:

1. Simply change the MOLGA 99 to 24 - I am not sure if this is a doable option since MOLGA change will affect the Payroll since for SAP introduced a new payroll driver for KSA payroll.

2. Scratch implementation in new MOLGA 24 (this is not a desireable option for us)

Looking forward hearing from you guys.

Thanks,
Muhammad Irfan
 
Reply to this email to post your response.
 
__.____._
Manage Settings | Unsubscribe | Create FAQ | Send Feedback
  
Copyright © 2013 Ziff Davis, Inc. and message author.
Ziff Davis, Inc. 28 E 28th Street New York, NY 10016
Irfan Malik  

achievement
 
View this online
Ask a new question
 
In the Spotlight
Become a blogger at Toolbox.com and share your expertise with the community. Start today.

_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language