We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-hr] SAP PCP - Quota Planning

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by abcnck (SAP HR Consultant/Team Lead)
on Mar 15 at 6:07 PM
Hello,
I am trying to use Quota Planning with PCP. I have set up a Quota Planning Cost Type that is 'Non CO Relevant' and attached to a Statistical Key figure. I marked it as 'non-cumulative' as the documentation states.
I run Data Gathering for Orgs, with method Quota planning and the Cost Item I described above. SAP creates Infotype 5010 for the Org Unit I select. However, the number in the infotype is no the difference between the Planned and Current, it is the total of the Planned (i.e the Current is 2 and the Planned is 3 but SAP returns 3 when I was expecting 1). Can anyone help me with this?
Thanks
Alex
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
Most Popular White Papers

In the Spotlight
Get Fast, Reliable Enterprise-Class Storage. Learn About IBM Storwize v7000
_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language