Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
All I have maintained the data in CL20N. This limits the release strategy and release to the account assignment K. Unfortunately since I set the overall release at the document level (NB). All NB documents are blocking (STO, material purchases) but are not subject to the release strategy. I want to eliminate blocking all other PR that do not fall under Doc Type = NB, Account Assignment = K. And still maintain just one Doc Type. Is this possible? Thanks so much Belle
| | | ---------------Original Message--------------- From: Belle Sent: Tuesday, January 18, 2011 1:27 PM Subject: Release Strategy for only PR with account assignment K Hi Expert I am trying to set up an overall release strategy with the following characteristics: total value and account assignment K. In order to get the overall release strategy to work I had to set the overall strategy at the document type level (NB). Now material PR and consumable PR are subject to an overall release. What can I do to set the strategy for only PR with account assignment K. Thanks Belle | | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Most Popular White Papers In the Spotlight _.____.__ |