We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-log-mm] Change BOM Based On Inventory Levels Not Dates

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by rdstewar (Engineering Manager)
on May 6 at 11:28 AM
I would to change a material number on an active BOM when the inventory for the current material number reaches zero in inventory. I essentially what to use up the old stock of a material number then switch to a new one. It would be best if MRP stops driving demand for the old item and drives demand for the new item.

It is difficult for me to know when the exact date for the change will happen so the “Valid To” and “Valid From” dates are difficult to use.

Any help would be great.
__.____._
Copyright © 2010 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251

0 comments:

Post a Comment

T r a n s l a t e to your language