[sap-log-mm] Change BOM Based On Inventory Levels Not Dates
Posted by
Admin at
Share this post:
|
0 Comments
Posted by rdstewar (Engineering Manager) on May 6 at 11:28 AM |
I would to change a material number on an active BOM when the inventory for the current material number reaches zero in inventory. I essentially what to use up the old stock of a material number then switch to a new one. It would be best if MRP stops driving demand for the old item and drives demand for the new item.
It is difficult for me to know when the exact date for the change will happen so the “Valid To” and “Valid From” dates are difficult to use.
Any help would be great.
__.____._ It is difficult for me to know when the exact date for the change will happen so the “Valid To” and “Valid From” dates are difficult to use.
Any help would be great.
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
_.____.__ White Papers
In the Spotlight
Your SAP Security is at Risk...Learn How to Stay Protected. Read the free white paper from SenSage