Hi HT
My Scenario Material is Fabric after GI to Production after cutting or
stitching or at any point of process this will go outside for minimum value
additions like embroidering or stitching and the same material is coming
back and after doing the rest of the process in our plant it is moved to
FG.Kinldy suggest me how to capture this in Std SAP.
Thanks
MK
On Wed, Apr 14, 2010 at 12:50 PM, ha_tran via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
>
> Posted by ha_tran (Senior SAP
> Supply Chain Business Analyst)
> on Apr 14 at 3:21 AM
> Hi MK,
>
> Can you provide a particular example of your business scenario with related
> material ID to illustrate your case?
>
> Cheers,
> HT
>
> ---------------Original Message---------------
> From: RobertWelch
> Sent: Tuesday, April 13, 2010 6:23 PM
> Subject: subcontracting scenario with unchanged ROH material number
>
> > Dear GURU's,
> >
> > I want to reclaim ROH material that was used in the repetitive
> production. The ROH material is not usable due to being greasy. I need to
> establish a Subcontracting process to get them cleaned. I want to send them
> out for cleaning, pay the subcontracted supplier to wash them and then
> receive them back in as the original material number.
> >
> > Since this is raw material and not a HALB, I am struggling on how to
> setup a subcontracted situation to handle the washing portion, this is a
> very small percentage of the total volume, however, I do not want to scrap
> this material as once it is cleaned it is usable.
> >
> > Any suggestions would be greatly valued.
> >
> > Thanks
__.____._ My Scenario Material is Fabric after GI to Production after cutting or
stitching or at any point of process this will go outside for minimum value
additions like embroidering or stitching and the same material is coming
back and after doing the rest of the process in our plant it is moved to
FG.Kinldy suggest me how to capture this in Std SAP.
Thanks
MK
On Wed, Apr 14, 2010 at 12:50 PM, ha_tran via sap-log-mm <
sap-log-mm@groups.ittoolbox.com> wrote:
>
> Posted by ha_tran (Senior SAP
> Supply Chain Business Analyst)
> on Apr 14 at 3:21 AM
> Hi MK,
>
> Can you provide a particular example of your business scenario with related
> material ID to illustrate your case?
>
> Cheers,
> HT
>
> ---------------Original Message---------------
> From: RobertWelch
> Sent: Tuesday, April 13, 2010 6:23 PM
> Subject: subcontracting scenario with unchanged ROH material number
>
> > Dear GURU's,
> >
> > I want to reclaim ROH material that was used in the repetitive
> production. The ROH material is not usable due to being greasy. I need to
> establish a Subcontracting process to get them cleaned. I want to send them
> out for cleaning, pay the subcontracted supplier to wash them and then
> receive them back in as the original material number.
> >
> > Since this is raw material and not a HALB, I am struggling on how to
> setup a subcontracted situation to handle the washing portion, this is a
> very small percentage of the total volume, however, I do not want to scrap
> this material as once it is cleaned it is usable.
> >
> > Any suggestions would be greatly valued.
> >
> > Thanks
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
In the Spotlight
_.____.__ Did this response help you resolve your issue? Click the green 'Mark as helpful' arrow to vote on the entry.