We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

RE: [sap-basis] Copy my production system to a pre-production one

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by D. Caddick (SAP NetWeaver/BASIS Consultant)
on Feb 10 at 5:47 PM
Mark this reply as helpfulMark as helpful
Hi,

This is a homogeneous System copy.

Regards

From: ibrismiss via sap-basis [mailto:sap-basis@Groups.ITtoolbox.com]
Sent: 10 February 2010 17:02
To: D. Caddick
Subject: [sap-basis] Copy my production system to a pre-production one




Posted by ibrismiss (IT Engineer)
on Feb 10 at 12:28 PM

Hi,
I have to copy my production system to a pre-production one. The OS will be
the same as well as the DB, it will just be on a different machine with a
different SID. And the other thing is that I already have an environment
(QUA) on that machine.
So my question is, is this an homogeneous or heterogeneous system copy ?
Redhat 4.6
Oracle 10.2.0.2
ECC 6
Thank you.
__.____._
Copyright © 2010 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
D. Caddick
SAP Basis Top Contributor

Contributed the most posts in a group for 3 consecutive months to earn a Gold Achievement
_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language